Building Restoration Oversight

Bid documents, bidding assistance, permitting, construction administration and oversight through project close-out.

Verification
Sealed by a licensed Florida PE, to The Fortis Standard
Updated
September 4, 2026
South Florida oceanfront tower documented during Fortis restoration oversight
Fortis project record · waterfront high-rise

01 / The Repair Blueprint

How Do Findings Become A Finished Repair?

The Direct Answer

What Does Restoration Design And Oversight Involve?

Restoration design and oversight covers the repair drawings and the construction that follows them: permit plans and repair quantity documentation developed from inspection findings, help selecting a general contractor, then oversight of repair quality and quantity through close-out. The Engineer of Record assigned to your building writes and seals the reporting.

Work typically begins with the findings of a recertification, milestone or condition inspection; from that assessment Fortis develops permit plans and repair quantity documentation, then helps the association select a general contractor. Through construction, Fortis engineers oversee the quality and quantity of repairs, review shoring design plans where they apply, respond to RFIs, perform Special Inspections, and prepare progress reports for the board — through project close-out.

Process

From Inspection Findings To Project Close-out

01. PHASE

Design & Permit

Development of comprehensive repair drawings, structural specifications, and permit-ready quantity documentation based on inspection data.

02. PHASE

GC Selection

Managing the bidding process, technical review of contractor qualifications, and expert support in general contractor selection.

03. PHASE

Administration

Reviewing shoring plans, responding to RFIs, and performing Special Inspections to oversee quality and quantity during construction.

04. PHASE

Close-out

Preparation of final progress reports and the formal Engineer of Record seal for project reporting and jurisdictional compliance.

Technical Scope Of Work

  • [+]Structural Repair Drawings & Details
  • [+]Repair Quantity Documentation For Permitting
  • [+]Shoring & Reshoring Plan Technical Review
  • [+]Contractor Bid Analysis & Recommendations

Field Governance

  • /01Special Inspector Site Presence
  • /02Request For Information (RFI) Management
  • /03Phased Construction Progress Reporting
  • /04Engineer Of Record Project Sealing

Project Record

1170 East Point Towers

1170 East Point Towers — Fort Lauderdale

Fort Lauderdale, Broward County · Waterfront condominium + detached 2-story garage structure

Fortis inspected the 1170 building and detached 2-story garage structure as part of the building recertification process. Developed permit plans, assisted with general contractor selection, oversees repair quality, manages RFIs, conducts Special Inspections, and generates progress reports for the HOA.

Outcome

Project is ongoing; restoration efforts are on schedule to be finished in 2026.

Restoration oversight puts a Fortis engineer on the owner’s side of the work: reviewing the contractor’s means and methods against the repair documents, observing the work in place, and documenting what was actually built. See the full project footprint.

Scope reference

From Distress Mapping To Repair Drawings

Documented distress locations become the repair drawings, the bid scope contractors price, and the checklist used during construction administration through close-out.

Questions

Common Restoration Questions, Answered

Who signs and seals Fortis’s inspection reports?

The Engineer of Record assigned to your building inspects it, writes the report, seals it, and presents the findings to the board. Every assessment is performed to one documented standard — the Fortis Standard — and sealed by a licensed Florida PE in direct responsible charge.

Does Fortis help the association select a contractor?

Yes. After developing the permit plans and repair quantity documentation, Fortis assists the association with general contractor selection, then oversees the quality and quantity of the repairs during construction.

What does Fortis do while repairs are underway?

Fortis oversees repair quality and quantity, responds to RFIs, performs Special Inspections, and prepares progress reports for the board or association through project close-out.

Next Step

Establish Where Your Building Stands

Send the property details and Fortis will confirm which requirement applies and provide a written scope before any fieldwork begins.