The reporting of what was observed, unaltered by budget or preference.
01 / Licensed FL PE Oversight

Every assessment is performed under the responsible charge of an active Florida Professional Engineer.
Built on Trust. Backed by Engineering.
Florida PE-led engineering for South Florida condominium boards, associations and property managers.
01 / Licensed FL PE Oversight

Every assessment is performed under the responsible charge of an active Florida Professional Engineer.
02 / Tri-County Jurisdictions
Prepared and filed to each jurisdiction's current requirements — milestone inspections under F.S. §553.899.
03 / Independent Advocacy
We diagnose.
We don't sell repairs.
No restoration contracting, no building-product sales, no contractor referral fees — so our findings protect your reserves, not a repair invoice.
04 / One Documented Standard
Inspection Report
Every finding photo-logged and carried into one PE-sealed report a board can act on.
The milestone inspection and the Structural Integrity Reserve Study are separate obligations under Florida law. They exist for different reasons. They run on different schedules. Reading one clock does not tell you what the other says.
The clocks below run on real statutory dates — §553.899 for the milestone inspection, §718.112(2)(g) for the SIRS. In Broward and Miami-Dade, the milestone clock is coupled to county recertification; the SIRS clock is not.
In Broward & Miami-Dade, county recertification is how the milestone clock is administered — SIRS runs on its own clock.
Hover any part of the building to see the service that answers it, what triggers it under Florida law, and what a typical scope covers. The full catalog is a click away.
Concrete restoration, balcony spalling, railing anchorage — the visible failures that drive complaints and lawsuits. This is the Phase 1 milestone inspection. In Broward and Miami-Dade, a current county recertification satisfies the milestone requirement.
The county recertification program satisfies the milestone inspection requirement in these two counties. SIRS is a separate obligation and is not replaced by recertification. In Palm Beach, the milestone inspection is administered directly under §553.899.
Local rule appliesIntake through close-out on a single timeline. Every stage owns a deliverable, an owner, and a date. Nothing about your project lives in someone's inbox.
Start your projectRelevant condo records and prior notices reviewed, so we know which requirements and deadlines apply to your building.
Scope memoEvery elevation, balcony, roof and garage slab walked and photographed by a licensed inspector — not a technician, not a subcontractor.
Photo recordObservation, evidence, recommendation, next step — signed by the engineer responsible for the work.
Signed reportWe stand in front of your board, translate every technical term on first use, and answer owners directly.
Board packetRestoration design, contractor selection support and construction administration through close-out.
Construction admin
The reporting of what was observed, unaltered by budget or preference.
Scope anchored to statute; evidence anchored to measurement.
Language a non-engineer can act on without a translator.
The willingness to be first on site and last to leave.
Consistency between what is promised and what is delivered.
A commercial relationship shaped by the other side's constraints.
Four active recertifications and milestone inspections across South Florida. Click any building to open the case record.
Selected active projects. Full portfolio linked below.
Selected project records. Fortis BuildSafe Solutions · Broward & Miami-Dade.
See the full project list →Founder


Founder and author of the Fortis Standard — the documented method every Fortis engineer works to, so the answer does not depend on which engineer shows up.
Latest Insight
Send the property details and Fortis will confirm which requirement applies and the scope of work involved. Prefer to talk? Call 954-756-6876.
Reviewed by a member of the Fortis team — reply within one business day